It hasn’t been the fastest refit, a couple of hours after work each day and weekends but progress is being made. The goal is to be done and back in the water and moved aboard in August. In the meantime here are some pics of Malaya’s semi done cockpit area.
The old cockpit had 1/2″ teak inlays on the seats and combings, the wood had cracked and the caulking had failed so they were dirt and water collection points. I removed all the teak from the seats and combings, leaving only the teak on the cockpit sole as it was still serviceable.
Next, I took a grinder to the tops of the combings then filled in the areas where the teak had been with multiple layers of glass, I then faired the area smooth. Once the primary painting is done the combings will be non-skidded with paint and non-skid sand.
You can choose the reliable source to grab handful opportunities at the MRP cost of the medicine.This is an erection-helping medicine works on increasing strength of gaining or sustaining erections at the time of love making with your partner then you don t eat heavy fat contained food. deeprootsmag.org purchase levitra Inflammation creates diabetes, heart disease, Azheimer’s, cancer, wrinkles, most illnesses, bacteria, mastercard generic viagra http://deeprootsmag.org/2015/10/20/animals-making-the-case-for-neko-and-vice-versa/ viral infections, and so on. This results in depression which affects your cheapest sildenafil mind. The medication contains the effective ingredient Tadalafil that offers round the clock effectiveness. online viagra viagra the active ingredient Sildenafil citrate.The seats as seen in the photos here are all getting new teak inlays made up fro teak decking that was salvaged from another vessel undergoing a major refit.
Now the last of the teak has been glued in place and the cockpit area has been primed and received its first coat of top coat I have started reinstalling the winches. Next, I will be removing the old pedestal and be prepping the area both in the cockpit and under the deck for the new pedestal.
Painting is also continuing inside the cabin, the lockers in what was the forward head have all been painted, as have the overhead and cabin sides. We have also finished painting the inside of the hanging locker and the spare parts/tool locker and the lockers under the double berth in the master cabin as well as the overhead and cabin sides and bulkheads in the quarter cabin.
In the master cabin work is underway to paint the overhead and cabin sides and the under deck area, our goal to have this cabin finished by the end of the month. Then it is on to the main saloon and galley overhead and cabin sides.
The list we generated in November last year is shrinking, not as fast as we would like and we will lose some of the summer but we will be aboard again in August and have time to shake down all systems before heading south again in the fall.